Refractory Works Projects
Home >> Refractory Works Projects
| List of Refractory Contracts (Ongoing & Executed) | |||||
|---|---|---|---|---|---|
| S. No. | Name of Contrat Or Plant Name | Client’s Name | Scope of Work | Refractory Type | Completion Year |
| 1 | QCHEM : Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company Ltd (Q-Chem) | Refractory Works | 2030 | |
| 2 | RLOC : Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company Ltd | Refractory Works | 2030 |
|
| 3 | Qatargas: Field Maintenance Scaffolding, Painting, Insulation and Refractory Services Long Term Call-Off Basis for 5 Years + 2 Years | QELNG | Refractory Works | 2026 | |
| 4 | QAFCO-7 Ammonia Plant and Associated Facilities, Mesaieed,Qatar | CCC | Refractory Works | 2025 |
|
| 5 | Domestic Solid Waste Management Centre (DSWMC) | Keppel Seghers Engineering Singapore PTE LTD | Refractory Works | Castable - Gunniting / Casting | Feb-23 |
| 6 | Domestic Solid Waste Management Centre (DSWMC) | Keppel Seghers Engineering Singapore PTE LTD | Refractory Works | Castable - Gunniting / Casting | May-22 |
| 7 | QCHEM II TA 2022 | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 26-Feb-22 |
| 8 | QatarEnergy | Descon Engineering Qatar | Refractory Works | Castable - Gunniting / Casting | 20-Mar-22 |
| 9 | Shell GTL MTA 3 | Madina Group | Refractory Works | Castable - Gunniting / Casting | March-22 |
| 10 | Shell GTL | Doosan Babcock Wll Qatar | Refractory Works | Castable - Gunniting / Casting | March-22 |
| 11 | QAPCO TA-2021 in LDPE 1 & 2 Plant (Sector 4 & 5) | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 27-Nov-21 |
| 12 | QAPCO TA-2021 in Vinyl Plant (Sector 7) | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 27-Nov-21 |
| 13 | Qatargas (South) Tr-1 & 2 SD | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 20-Jun-21 |
| 14 | Qatargas (South) AKG 1 & 2 | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 1-Feb-21 |
| 15 | Qatargas (South) Tr-5 SD | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 1-Dec-20 |
| 16 | QCHEM/RLOC | QCHEM | Refractory Works | Castable - Gunniting / Casting | 20-Mar-20 |
| 17 | Qatargas (South) Tr-1 & 2 SD | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 23-Apr-19 |
| 18 | Qatargas (South) Tr-6 & 7 SD | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 5-Nov-19 |
| 19 | Qatargas (South) Tr-3 & 4 SD | Qatar Engineering & Construction Company (Qcon) | Refractory Works | Castable - Gunniting / Casting | 24-Apr-19 |
| 20 | QAFAC Feb' 2019 SD | Descon Engineering Qatar | Refractory Works | Castable - Gunniting / Casting | 30-Mar-19 |
| 21 | QP - RFCC Shutdown -2017 | Descon Engineering Qatar | Refractory Works | Castable - Gunniting / Casting | 22-Mar-18 |
| 22 | Q-Chem - Major Shutdown 2017 | Descon Engineering Qatar | Refractory Works | Castable - Gunniting / Casting | 31-Mar-17 |
| 23 | Annual Maintenance Contract for Insulation, Scaffolding & Refractory Works | Qatar Petrochemical Company (QAPCO) | Refractory Works | Castable – Gunniting / Casting | 31-Mar-17 |
| 24 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace - 2 Nos | Castable – Gunniting / Casting | 2016 |
| 25 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Boiler-Superheater Replacement | Brick | 2016 |
| 26 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Boiler-Superheater Replacement | Castable- Gunniting / Casting | 2016 |
| 27 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Castable- Gunniting / Casting | 2016 |
| 28 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Brick | 2016 |
| 29 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Burner Modules | 2016 |
| 30 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Rk (Rotary Kiln) | Brick | 2015 |
| 31 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace - 5 Nos | Brick | 2015 |
| 32 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace - 5 Nos | Ceramic Modules | 2015 |
| 33 | QAPCO - Annual Maintenance Contract for Insulation, Scaffolding, Painting & Refractory Works | Qatar Petrochemical Company (QAPCO) | Incinerator Stack | Castable- Gunniting / Casting | 2015 |
| 34 | QAPCO - Annual Maintenance Contract for Insulation, Scaffolding, Painting & Refractory Works | Qatar Petrochemical Company (QAPCO) | Incinerator Stack | Brick | 2015 |
| 35 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Boiler - 1 Nos | Castable- Gunniting / Casting | 2015 |
| Brick | 2015 | ||||
| 36 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Castable- Gunniting / Casting | 2015 |
| 37 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Brick | 2015 |
| 38 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Thermal Oxidiser | Castable- Gunniting / Casting | 2015 |
| 39 | QAPCO - Annual Maintenance Contract for Insulation, Scaffolding, Painting & Refractory Works | Qatar Petrochemical Company (QAPCO) | Sulphur Pit | Castable- Gunniting / Casting | 2014 |
| 40 | NGL - Annual Maintenance Works for Gas Operations Mesaieed | QP - NGL | Heaters | Castable – Gunniting / Casting | 2014 |
| Brick | 2014 | ||||
| 41 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Boiler - 1 Nos | Castable- Gunniting / Casting | 2014 |
| Brick | 2014 | ||||
| 42 | Qatargas - DHT-Laffan Refinery | Qatar Engineering & Construction Company (Qcon) | Heaters-2 Nos | Castable – Gunniting / Casting | 2014 |
| Brick | 2014 | ||||
| 43 | BARZAN Onshore Project Raslaffan | Descon Engineering Qatar | Incinerator + Stack | Castable – Gunniting / Casting | 2014 |
| Brick | 2014 | ||||
| 44 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Castable- Gunniting / Casting | 2014 |
| 45 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Brick | 2014 |
| 46 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Fgcc (Flue Gas Combustion Chamber) | Acid Proof Castable – Gunniting / Casting | 2013 |
| 47 | QP Refinery Shutdown Train 1 & 2 And Utilities | Descon Engineering Qatar | Reformer & Heaters | Castable- Gunniting / Casting | 2013 |
| 48 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Boiler - 1 Nos | Castable- Gunniting / Casting | 2013 |
| Brick | 2013 | ||||
| 49 | Qatargas - Plateau Maintenance Project (PMP) | Descon Engineering Qatar | Exchangers,Reactors | Castable- Gunniting / Casting | 2014 |
| Brick | 2014 | ||||
| 50 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Castable- Gunniting / Casting | 2013 |
| 51 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Brick | 2013 |
| 52 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Thermal Oxidiser | Castable- Gunniting / Casting | 2013 |
| 53 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Thermal Oxidiser | Brick | 2013 |
| 54 | Al Khaleej Cement Factory | Descon Engineering Qatar | Hot Air Duct | Refractory Tiles | 2013 |
| 55 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Pcc (Post Combustion Chamber) | Brick | 2012 |
| 56 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace - 5 Nos Convection Section | Castable- Gunniting / Casting | 2012 |
| 57 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace Firebox - 5 Nos | Brick | 2012 |
| 58 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace Firebox - 5 Nos | Ceramic Modules | 2012 |
| 59 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Boiler - 1 Nos | Castable- Gunniting / Casting | 2012 |
| Brick | 2012 | ||||
| 60 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Brick | 2012 |
| 61 | RLOC - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Ras Laffan Olefins Company (Rloc) | Furnace Jobs | Ceramic Modules | 2012 |
| 62 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace Convection Section - 2 Nos | Castable – Gunniting / Casting | 2011 |
| 63 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace Firebox - 2 Nos | Brick | 2011 |
| 64 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace Firebox - 2 Nos | Ceramic Modules | 2011 |
| 65 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Rk (Rotary Kiln) | Brick | 2011 |
| 66 | Shell GTL Project | Consolidated Contractors Company - CCC | Hrsg - 8 Nos | Ceramic Blanket | 2010 |
| 67 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Primary Reformer - 2 Nos | Brick | 2009 |
| 68 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Primary Reformer - 2 Nos | Castable- Gunniting / Casting | 2009 |
| 69 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Primary Reformer - 2 Nos | Ceramic Modules | 2009 |
| 70 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Flue Gas Duct | Castable- Gunniting / Casting | 2009 |
| 71 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Secondary Reformer | Castable- Gunniting / Casting | 2009 |
| 72 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Coal Collector | Castable- Gunniting / Casting | 2009 |
| 73 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Baustic Boiler | Castable- Gunniting / Casting | 2009 |
| 74 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Boiler | Castable- Gunniting / Casting | 2009 |
| 75 | Qatar Fertiliser Company (QAFCO) - 5 & 6 Project | Hyundai Engineering / Sejong Co. | Boiler | Brick | 2009 |
| 76 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Boiler - 3 Nos | Castable- Gunniting / Casting | 2008 |
| 77 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Boiler - 3 Nos | Refractory Tiles | 2008 |
| 78 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Hopper-3 Nos | Castable- Gunniting / Casting | 2008 |
| 79 | Domestic Solid Waste Management Centre (DSWMC) Annual Maintenance Contract | Keppel Seghers Engineering Singapore Pte Ltd | Hopper-3 Nos | Calcium Silicate | 2008 |
| 80 | Qatargas - Laffan Refinery, Phase -1 | GS Engineering / Daewoo | Reformer & Heaters | Castable- Gunniting / Casting | 2008 |
| Brick | 2008 | ||||
| 81 | Call off Contract for Refractory Repairs & Replacement at QP Refinery, Mesaieed | QP Refinery | RFCC | Castable- Gunniting / Casting /Hand Packing with Hexmesh | 2006-07 |
| 82 | QP Lab Project | GS Engineering/KUKJE/IWI Ltd. | Reformer | Ceramic Fibre Blanket | 2006 |
| Brick | 2006 | ||||
| 83 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Furnace Convection Section-5 Nos | Castable – Gunniting / Casting | 2004 |
| 84 | RasGas Onshore Expansion Project Train-3 & 4 | Consolidated Contractors Company - CCC | Incinerator , Exchangers, Reactor | Castable- Gunniting / Casting | 2002 |
| Brick | 2002 | ||||
| 85 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Incinerator Stack | Brick | 2001 |
| 86 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Incinerator Stack | Calcium Silicate | 2001 |
| 87 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Incinerator Stack | Castable- Gunniting / Casting | 2001 |
| 88 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Rk (Rotary Kiln) | Brick | 2000 |
| 89 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Pcc (Post Combustion Chamber) | Brick | 2000 |
| 90 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Pcc (Post Combustion Chamber) | Castable- Gunniting / Casting | 2000 |
| 91 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Fgcc (Flue Gas Combustion Chamber) | Acid Proof Castable – Gunniting / Casting | 2000 |
| 92 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Sru Incinerator & Stack | Brick | 2000 |
| 93 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Sru Incinerator & Stack | Castable- Gunniting / Casting | 2000 |
| 94 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Sulphur Pit | Acid Proof Castable- Gunniting / Casting | 2000 |
| 95 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Sulphur Pit | Brick | 2000 |
| 96 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Claus Reactors | Castable- Gunniting / Casting | 2000 |
| 97 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Sru Thermal Reactor | Castable- Gunniting / Casting | 2000 |
| 98 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Sru Thermal Reactor | Brick | 2000 |
| 99 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Boiler | Castable- Gunniting / Casting | 2000 |
| 100 | Q-Chem - Annual Maintenance Contract for Insulation, Scaffolding, Painting and Refractory Works | Qatar Chemical Company (Q-Chem) | Boiler | Brick | 2000 |
| 101 | Refractory Work At Qatar Vinyl Company For Cracking Furnance - QVC | Consolidated Contractors Company - CCC | Exchangers | Brick | 1999 |
| 102 | Refractory Work At Qatar Vinyl Company For Cracking Furnance - QVC | Consolidated Contractors Company - CCC | Heater | Ceramic Fibre Blanket | 1999 |
| Castable- Gunniting / Casting | 1999 | ||||
| 103 | Qatar Fuel Additives Company (QAFAC) - MTBE | Cleveland Bridge | Reformer-1 Nos | Brick | 1998 |
| 104 | Qatar Fuel Additives Company (QAFAC) - MTBE | Cleveland Bridge | Reformer-1 Nos | Ceramic Modules | 1998 |
| 105 | Qatar Fuel Additives Company (QAFAC) - MTBE | Cleveland Bridge | Flue Gas Duct | Castable- Gunniting / Casting | 1998 |
| 106 | Qatar Fuel Additives Company (QAFAC) - MTBE | Cleveland Bridge | Heater | Castable- Gunniting / Casting | 1998 |
| 107 | Qatar Fuel Additives Company (QAFAC) - MTBE | Cleveland Bridge | Heater | Ceramic Modules | 1998 |
| 108 | Qatar Steel Company | Qatar Steel Company | Reactor | Brick | 1997 |
| 109 | Qatar Steel Company | Qatar Steel Company | Reformer | Brick | 1997 |
| 110 | Qatar Steel Company | Qatar Steel Company | Flue Gas Duct | Brick | 1997 |
| 111 | RasGas Onshore Expansion Project Train-1 & 2 | RasGas Company Limited | Incinerator , Exchangers, Reactor | Castable- Gunniting / Casting | 1997 |
| Brick | 1997 | ||||
| 112 | Qatargas Operating Company Limited | Qatargas Operating Company Limited | Stack,Exchanger, Line Burner, Vessel | Castable- Gunniting / Casting | 1995 |
| Sulphur Pit | Brick | 1995 | |||