List of Scaffolding Contracts executed by INECO
S.No Name of Contract Client Completion Date
1 QatarGas (South) Train-7 SRU
Shutdown 2018
Qcon 1-Dec-18
2 QatarGas (North) Train-4
Shutdown 2018
Descon Engineering 1-Nov-18
3 QatarGas (South) Shutdown 2018 Qcon 31-Mar-18
4 QATARGAS:  BAHX REPLACEMENT
IN TRAIN 7
Qcon 31-Mar-17
5 QatarGas Shutdown Train -7 Descon Engineering March-17
6 Q-Chem – Major Shutdown 2017 Descon Engineering 31-Mar-17
7 Annual Maintenance Contract
for Insulation, Scaffolding &
Refractory Works
QAPCO 31-Mar-17
8 QAFCO Scaffolding Works frame
contract 3 years + 2 years
QAFCO 16-Nov-16
9 Removal of Top Side Cable Tray
Cover at QAFCO 5 & 6 Project
Hyundai Engineering & Construction Co. Ltd. 30-Nov-16
10 Flare Elimination at Start – Up of Train 4 & 5 Project Doha Petroleum Construction Co. Ltd. Jul-16
11 QatarGas Shutdown Train -3 &
PMP, 2016
Descon Engineering May-16
12 Qatargas Train -6, Shutdown
March-2016
Descon Engineering May-16
13 Qatargas BAHX, Train -6 Shutdown Qcon April-16
14 QP Refinery Shutdown 2015

Descon Engineering

2015
15 RLOC Turnarround Shutdown 2015

Descon Engineering

2015
16 Insulation Maintenance Works
for Gas Operations Mesaieed (NGL)

: 30.8263%;” width=”108″>Jan-16
17 Qapco General Shutdown 2014

QAPCO

2014
18 Call-Off Contract for Insulation,
Painting and Scaffolding
Works AMC
SEEF Limited 2014
19 Annual Maintenance Contract
for Insulation, Scaffolding, Painting
and Refractory Works
Q-Chem & Rasslaffan Olefins 2014
20 Contract for Scaffolding Works–Civil and Building
Works for New Furnace inside
QAPCO

: 30.8263%;” width=”108″>2013
21 Contract for Scaffolding Works –
Sea Water Intake Pump
House, Intake off shore
Structure and Urea Structure

Dicotech

2013
22 Turnaround Shutdown 2013 at
Qatar Petroleum (QP) Crude
Oil Refinery Mesaieed

Descon Engineering

2013
23 Dismantling of Scaffold

Hyundai Engineering & Construction Co. Ltd.

2013
24 Q-Chem Shutdown Works

Descon Engineering

2012
25 QAFCO-5 Project Hyundai Engineering & Construction Co. Ltd. 2011
26 Waste Management Center &
Transfer Stations Project
Keppel Seghers Engineering Singapore Pte. Ltd. 2011
27 QAFCO-5 Project

CB&I

2010
28 Nakilat Project Daewoo 2010
29 Ras Aabu Fontas B2 Project

AM.EM

2010
30 Laffan Refinery Project

Daewoo

2009
31 Ras Laffan Onshore Expansion
Project Train -6&7
Chiyoda / Plibrico 2008
32 Ras Laffan Onshore Expansion
Project Train -5
Chiyoda / Plibrico 2007
33 Ras Laffan Power Station
Boiler 1,2 & 3

AM.EM JV

2007
34 QP LAB Project

GS Engg.

2006
35 QP Lab Project KUK JE 2006
36 AL Khaleej Gas Plant Project Chiyoda / CCIC 2005
37 Ras Laffan Expansion
Project Train – 4
Chiyoda / CCIC 2005
38 Fahahil Stripping Plant Shutdown
Works, Dukhan
2004
39 Q-Chem Project, Qatar Dodsal Ltd.
odsal Ltd.
2002